Weeks 50-51 - 30Sep 2002

Firstly apologies to regular visitors, I missed a week! This is for two reasons, firstly I have been very busy and secondly because they seemed to merge into one and were virtually identical.

Basically:

I continue the electrics. Outside lights need to be fitted before ceilings/access are lost. The second consumer unit is fitted. With the size of the house I have opted for three, one in the basement, one on the 1st floor and one for my Parents' Annex. This prevents extremely long cable runs.

Outside Lights fitted
1st Floor Consumer Unit
The plasterers continue....
Vic with the magic trowel!
Our bedroom!
We have opted to wire the underside of every window.
This is a cheap job but should prevent cracking which almost always appears under the windows.

Next Week...