Week58 - 18Nov 2002

Progress this week:

The French Doors for the Main bedroom are fitted.
The balcony is delieverd. Manufactured in small sections to allow easy fitting. Shown here the main frame<
The floor.
The frame is fitted.
Job done! Quote to have the balcony fitted was £400. It cost me £57 to hire the scafold tower (also needed for 2 other jobs in the house) and a day's work.
First proper look at the "North Wing".
The two front doors are prepared. We stain one side and paint the other to match the Anderson windows. One of the doors however has two panels which appear to be made of different wood. The rep has been to look & a new door is on order. Not before we have spent £70 having them fitted. We await the manufactures report.

Next Week