Week66 - 13Jan 2003

Progress this week

Downpipes all connected to rainwater tanks in the basement.
Final trapdoor fitted
Outside lights fitted to the rear of the house
and the ones to the front
The oiling of the kitchen tiles continues

Meanwhile at Mum's end of the house we fit the wall units in the kitchen to gain floor space and prevent them being damaged.

Rob joins the work force
Mum tries her kitchen table for size!
Mum's kitchen looking from the lounge
and from the bedroom